6G81 0958 Colton Jn to Belmont Down Yard
Departing on 29th September 2024

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Colton Jn
Pathed as Diesel locomotive, trailing load 1800 tonnes at 60mph
0958
0924
-34
LSL
0.64
pass
1000
pass
0926¼
-33
UL
UN
3.29
1
pass
1004½
pass
0931¼
-32
5.17
1
pass
1007½
pass
0933½
-33
UN
UN
7.23
1
pass
1011½
pass
0936¼
-35
UN
DS
7.54
pass
1012½
pass
0937
-35
US
8.69
Gascoigne Wood Jn.
Service stops for pathing (passing train)
1020
1050
0942
0951¼
-58
DS
DH
10.52
pass
1055½
pass
0955½
-59
DH
WC
11.70
Hambleton South Jn.
3
Service stops for pathing (passing train)
1059½
1117½
No report
16.69
pass
1129½
pass
1018
-71
UM
25.37
pass
1140
No report
25.69
pass
1140½
pass
1027
-73
UM
28.09
pass
1144½
No report
29.59
pass
1148
No report
30.08
G1
pass
1148½
pass
1100
-48
WS2
30.47
pass
1149½
pass
1127¾
-21
31.42
1157
1135
-22