1S03 2303 Daventry Int Rft Recep Rfd to Shieldmuir Mail Terminal
Departing on 30th September 2024

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
pass
2310
DNL
2
pass
2314
DNL
FL
pass
2321
FL
FL
pass
2323
pass
2325½
FL
FL
3
pass
2328½
FL
FL
pass
2336
FL
FL
pass
2344½
pass
2353
FL
FL
pass
2356½
FL
FL
5
pass
0005½
SL
SL
pass
0010½
pass
0018
pass
0020½
SL
SL
pass
0033½
6
pass
0034
pass
0034½
pass
0041
FL
pass
0044½
pass
0045½
pass
0047½
pass
0052
OL
pass
0054½
Warrington Bank Quay [WBQ]
Service stops for staffing reasons
3
0056
0102
FL
pass
0105½
pass
0108½
SL
pass
0114½
pass
0120
pass
0122
pass
0124
pass
0125½
pass
0126
DFL
3
pass
0127
DFL
DFL
pass
0138
DFL
pass
0141½
pass
0143
pass
0149½
pass
0157
pass
0158½
pass
0159
pass
0203½
pass
0207½
pass
0222½
pass
0230½
pass
0236
3
pass
0236½
pass
0237
pass
0241½
pass
0243
pass
0243½
pass
0250½
pass
0255½
DM
pass
0302
DM
pass
0309
pass
0311
DM
pass
0314½
pass
0320½
pass
0327½
pass
0332½
pass
0334½