5D32 2307 Leeds to Neville Hill T&R.S.M.D
Departing on 11th January 2025

operated by
LNER
InterCity 225 (9 coaches)
91114
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Leeds [LDS]
Pathed as Electric locomotive, trailing load 410 tonnes at 125mph
9
2307
2311¾
+4
DH
0.24
pass
2308
pass
2312¾
+4
DH
1.02
pass
2310
pass
2314
+4
DH
DHG
1.56
pass
2313
No report