2B16 0731 Maidenhead to Bourne End
Departing on 26th September 2024

operated by
Great Western Railway
2 coaches
165129
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Maidenhead [MAI]
Pathed as Class 165/1 or 166 DMU at 90mph
5
0731
0731
0731
B
1.22
0735
0735
0734½
0735
No report
2.73
0738
0738
0738
0738½
No report
4.36
2
0742
0742
0742