9S68 2240½ Three Bridges to CambridgeDeparting on 6th November 2024
operated by
Thameslink
This service is partially cancelled
This service was cancelled between Brighton and Three Bridges due to a signalling problem (track circuit failure) (IC).
This service is cancelled.
This service was cancelled due to a signalling problem (track circuit failure) (IC).
GBTT
WTT
Realtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line