4L49 1520 Trafford Park F.L.T. to London Gateway Frghtliner
Departing on 17th September 2024

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
pass
1526
pass
1528½
pass
1534½
pass
1535½
pass
1536½
pass
1537½
pass
1540½
pass
1543
pass
1547½
Wilmslow [WML]
Service stops for pathing (passing train)
2
1551½
1553
pass
1600½
3
pass
1611½
IL
pass
1620½
pass
1621
pass
1621½
pass
1622½
Crewe Sig.Nh43/44
Service stops for staffing reasons
1629½
1631½
pass
1646
SL
SL
pass
1648½
4
pass
1703½
SL
SL
pass
1708½
FL
pass
1715
FL
SL
pass
1719
SL
SL
pass
1725½
pass
1733½
pass
1746½
5
pass
1747½
SL
SL
pass
1755
pass
1759
Rugby [RUG]
Service stops for pathing (passing train)
6
pass
1807
SL
UNL
pass
1819
pass
1840
pass
1845½
SL
4
pass
1855
SL
SL
pass
1904½
SL
SL
pass
1911½
5
pass
1912
SL
SL
pass
1920½
9
pass
1926½
SL
SL
pass
1928
6
pass
1932½
SL
SL
Wembley Receptions 1-7
Pathed as Diesel locomotive, trailing load 1475 tonnes from here
Service stops for pathing (passing train), stops for staffing reasons
5
1943
2011
pass
2022½
Kensal Green Jn [XKG]
Service stops for pathing (passing train)
2028
2030
pass
2053½
2
pass
2059½
7
pass
2116
ML
2
pass
2134
pass
2137
pass
2149½