6M24 2225 Doncaster Down Decoy Gbrf to Peak Forest Cemex Gbrf
Departing on 19th August 2024

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Mi.Ch
Location
Pl
Arr
Dep
Path
Line
0.28
pass
2227
DS1
1.53
pass
2229
GL
1.69
pass
2230
3.35
pass
2236
6.14
pass
2240
8.36
pass
2243½
11.51
pass
2249
14.20
pass
2253
14.78
pass
2254
16.51
pass
2256
16.69
pass
2256
17.29
pass
2256½
18.23
pass
2257½
19.44
pass
2259
20.01
8
pass
2303½
20.41
pass
2305½
21.59
Heeley Up Loop
Service stops for pathing (passing train)
2310½
2313½
23.67
pass
2317
24.20
pass
2319
24.47
pass
2321
25.13
pass
2322
29.21
1
pass
2327
31.11
pass
2329
32.73
1
pass
2331
35.51
pass
2335
39.45
1
pass
2344
44.03
pass
2357
44.61
pass
2358
45.21
Chinley Signal Cy168
Service stops for pathing (passing train)
0001
0006
48.58
Peak Forest S.B.
Service reverses here
0015
0024