6D95 1456 Bescot Up Engineers Sdgs to Toton North Yard
Departing on 18th November 2024

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Mi.Ch
Location
Pl
Arr
Dep
Path
Line
0.52
pass
1459
1.57
pass
1501
SL
2.42
1
pass
1504
3.09
pass
1505
10.48
pass
1521
14.42
Park Lane Jn West Mids [XIA]
Service stops for pathing (passing train)
1530
1533
15.42
pass
1537
15.78
2
pass
1539
19.72
pass
1544½
20.78
pass
1545½
23.64
pass
1548½
25.53
pass
1550½
29.71
pass
1554½
33.09
pass
1557½
37.16
pass
1602
38.14
pass
1603
38.44
1
pass
1603½
UTF
39.65
pass
1605
40.57
pass
1606
43.28
pass
1609
44.17
pass
1610
44.55
pass
1612
53.34
pass
1624
57.05
pass
1630½
57.49
pass
1633½
58.33
pass
1636
GL
59.06
pass
1637
59.44
pass
1638