6M52 1026 Crawley F.Y.(Flhh) to Wembley Receptions 1-7
Departing on 2nd January 2025

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
Three Bridges 1737 Points
Service reverses here
1030
1032
SL
pass
1034½
pass
1037½
1
pass
1042
Redhill [RDH]
7
Service stops for pathing (passing train)
UML
1049
1051
pass
1055½
pass
1106½
SL
3
pass
1108½
3
pass
1115½
4
pass
1117½
SL
pass
1118½
SL
2
pass
1120½
2
pass
1129½
pass
1136
2
pass
1136½
UBS
16
pass
1142½
DWL
Latchmere Jn
½
Service stops for pathing (passing train)
1145½
1155
pass
1208½
Acton Lane Reception Sdgs
Service stops for pathing (passing train)
2
1218
1338½
pass
1341½
DR
pass
1343½