6M52 0958 Crawley F.Y.(Flhh) to Wembley Receptions 1-7
Departing on 22nd November 2024

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
Three Bridges 1737 Points
Service reverses here
1002
1004
SL
2
pass
1007
SL
pass
1008½
1
pass
1012½
2B
pass
1023
pass
1025½
3
pass
1033
3
pass
1037½
2
pass
1043½
pass
1049½
pass
1053½
pass
1058
2
pass
1059
UBS
Latchmere Jn
1
Service stops for pathing (passing train)
1107
1125½
pass
1139½
Acton Lane Reception Sdgs
Service stops for pathing (passing train)
2
1147½
1338½
pass
1341½
DR
pass
1343½