6D10 2021 Ferrybridge Ps Gypsum Gbrf to Doncaster Down Decoy Gbrf
Departing on 18th November 2024

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Ferrybridge Ps Gypsum Gbrf
Pathed as Diesel locomotive, trailing load 600 tonnes at 60mph
2021
1950
-31
0.69
pass
2026
pass
1953
-33
UK
1.33
pass
2029
pass
1956¾
-32
UK
UD
1.79
pass
2031½
pass
1958½
-32
UD
UK
8.25
pass
2042½
pass
2007
-35
10.79
pass
2047½
pass
2013
-34
12.08
Shaftholme Jn
1 ½
Service stops for pathing (passing train)
2051
2119
2013
2036
-42
UK
UM
14.28
pass
2123½
pass
2041
-42
15.78
pass
2127
pass
2051
-35
16.27
Doncaster [DON]
Service stops for pathing (passing train)
3B
2128
2131
2052¾
2053½
-37
UM
WS1
16.66
pass
2132½
pass
2056
-36
WS1
WS1
18.11
pass
2135
pass
2059¼
-35
WS1
REC