6D10 2021 Ferrybridge Ps Gypsum Gbrf to Doncaster Down Decoy Gbrf
Departing on 25th November 2024

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Ferrybridge Ps Gypsum Gbrf
Pathed as Diesel locomotive, trailing load 600 tonnes at 60mph
2021
1930
-51
0.69
pass
2026
pass
2003
-23
UK
1.33
pass
2029
pass
2008¼
-20
UK
UD
1.79
pass
2031½
pass
2010¼
-21
UD
UK
8.25
pass
2042½
pass
2018¼
-24
10.79
pass
2047½
pass
2024
-23
12.08
Shaftholme Jn
1 ½
Service stops for pathing (passing train)
2051
2119
2024
2039¾
-39
UK
UM
14.28
pass
2123½
pass
2044¼
-39
15.78
pass
2127
pass
2045½
-41
16.27
Doncaster [DON]
Service stops for pathing (passing train)
3B
2128
2131
2047½
2050½
-40
UM
DC
16.66
pass
2132½
No report
WSL
18.11
pass
2135
No report