6H47 0620 Hope St Peakstone P.Sdgs to Peak Forest Cemex Gbrf
Departing on 21st November 2024

This service is cancelled.

This service was cancelled due to a request by the train operator (FL).

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hope St Peakstone P.Sdgs
Pathed as Diesel locomotive, trailing load 600 tonnes at 60mph
0620
0625
+5
0.33
1
pass
0622
pass
0628
+6
F
USD
0.60
pass
0622½
pass
0629¼
+6
USD
USF
0.76
pass
0623½
No report
1.12
6
pass
0624½
pass
0633¾
+9
USF
DRF
1.21
pass
0625
pass
0635¾
+11
DRF
DRS
1.43
pass
0626
No report
2.42
pass
0629½
pass
0638¼
+8
DRS
DA
2.71
pass
0631½
pass
0639
+7
3.51
pass
0632½
pass
0640
+7
DA
6.53
pass
0637
pass
0648¼
+11
DA
UC
8.77
pass
0642
pass
0653¼
+11
UC
UM
9.48
1
pass
0642½
pass
0655
+12
9.77
pass
0643
pass
0656
+13
UM
UDB
11.37
1
pass
0645½
pass
0659
+13
12.25
pass
0647
pass
0700¾
+13
UDB
UB
13.07
pass
0648
pass
0703
+15
UB
US
13.69
1
pass
0650
pass
0705
+15
US
US
14.11
pass
0651
pass
0706
+15
14.34
pass
0652
pass
0706½
+14
US
UHV
15.16
1
pass
0654
pass
0708¾
+14
15.59
1
pass
0655½
pass
0710
+14
16.55
1
pass
0658
pass
0712¼
+14
UHV
UDV
17.17
pass
0659
pass
0713
+14
UDV
UMN
22.40
UM
pass
0706
pass
0721
+15
25.17
pass
0712
No report
26.18
pass
0714
pass
0729
+15
27.02
pass
0716
No report
27.42
pass
0718
No report
30.79
Peak Forest S.B.
Service stops for pathing (passing train), reverses here
0725
0731
0741
0754
+23
31.32
0741
0804
+23