6H79 2047 Doncaster Roberts Rd Rp Gb to Peterborough North Yd Gbrf
Departing on 21st September 2024

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Doncaster Roberts Rd Rp Gb
Pathed as Diesel locomotive, trailing load 600 tonnes at 60mph
2047
2047
0.30
pass
2051
No report
GL
0.46
pass
2052½
No report
WSL
1.71
pass
2055
No report
ULF
2.46
pass
2056
pass
2057
+1
REC
ULC
4.10
pass
2058½
pass
2104¾
+6
ULC
UM
12.45
pass
2107
pass
2119¼
+12
16.19
pass
2110½
pass
2122¾
+12
16.50
pass
2111
No report
17.41
pass
2112
pass
2124
+12
30.50
pass
2125
pass
2137¼
+12
UM
35.27
pass
2131
pass
2142¼
+11
36.02
2
pass
2132
pass
2143¼
+11
40.20
pass
2137½
pass
2147¾
+10
46.34
pass
2143
pass
2153¼
+10
50.02
pass
2146½
pass
2157
+10
UM
UF
50.52
1
pass
2147
pass
2158¼
+11
54.44
pass
2151
pass
2201¾
+10
UF
UM
56.30
pass
2153
pass
2204
+11
UM
UF
71.26
Tallington Jn.
1
Service stops for pathing (passing train)
pass
2208
pass
2221
+13
UF
US
74.34
pass
2212½
pass
2224½
+12
76.56
pass
2215½
pass
2227
+11
78.04
pass
2217½
No report