6E99 2009 March Down R.S. to Peterborough North Yd Gbrf
Departing on 9th January 2025

This service is cancelled.

This service was cancelled due to a request by the train operator (FL).

WTT
RTTRealtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
March Down R.S.
Pathed as Diesel locomotive, trailing load 400 tonnes at 60mph
2009
-
pass
2012
-
pass
2012
-
pass
2013½
-
pass
2025
-