6H47 0318 Hope St Peakstone P.Sdgs to Peak Forest Cemex Gbrf
Departing on 9th January 2025

This service is cancelled.

This service was cancelled due to a problem with the train (ML).

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hope St Peakstone P.Sdgs
Pathed as Diesel locomotive, trailing load 600 tonnes at 60mph
0318
-
0.33
pass
0320
-
0.60
pass
0320½
-
0.76
pass
0321½
-
2.42
pass
0325
-
2.71
pass
0325½
-
3.51
pass
0326½
-
6.53
pass
0332
-
8.77
pass
0338
-
9.48
pass
0338½
-
9.77
pass
0339
-
11.37
pass
0341½
-
12.25
pass
0343
-
13.07
Heaton Norris Jn
Service stops for pathing (passing train)
0345
0400
-
13.69
pass
0403
-
14.11
pass
0404
-
14.34
pass
0405
-
15.16
pass
0407
-
15.59
pass
0408½
-
16.55
pass
0411
-
17.17
pass
0412
-
22.40
pass
0419½
-
25.17
pass
0425½
-
26.18
pass
0428
-
27.02
pass
0430
-
27.42
pass
0432
-
30.79
Peak Forest S.B.
Service stops for pathing (passing train), reverses here
0439
0445
-