6H79 2047 Doncaster Roberts Rd Rp Gb to Peterborough North Yd Gbrf
Departing on 4th January 2025

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Doncaster Roberts Rd Rp Gb
Pathed as Diesel locomotive, trailing load 600 tonnes at 60mph
2047
2041
-6
0.30
pass
2051
No report
GL
0.46
pass
2052½
No report
WSL
1.71
pass
2055
No report
ULF
2.46
pass
2056
pass
2050½
-5
RMT
ULC
4.10
pass
2058½
pass
2055
-3
ULC
UM
12.45
pass
2107
pass
2105¾
-1
16.19
pass
2110½
pass
2109¼
-1
16.50
pass
2111
No report
17.41
pass
2112
pass
2110¾
-1
30.50
pass
2125
pass
2124¼
UM
35.27
pass
2131
pass
2129½
-1
36.02
2
pass
2132
pass
2130½
-1
40.20
pass
2137½
pass
2135¼
-2
46.34
pass
2143
pass
2140¾
-2
50.02
pass
2146½
pass
2144¾
-1
UM
UF
50.52
1
pass
2147
pass
2145¾
-1
54.44
pass
2151
pass
2149½
-1
UF
UM
56.30
pass
2153
pass
2151¾
-1
UM
UF
71.26
Tallington Jn.
1
Service stops for pathing (passing train)
pass
2208
pass
2209
+1
UF
US
74.34
pass
2212½
pass
2212¾
76.56
pass
2215½
pass
2215¼
78.04
pass
2217½
No report