6D09 0917 Hull Coal Terminal (Gbrf) to Ferrybridge Ps Gypsum Gbrf
Departing on 9th January 2025

WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Hull Coal Terminal (Gbrf)
Pathed as Diesel locomotive, trailing load 1800 tonnes at 60mph
0917
0917
0.40
pass
0932
No report
1.01
0937
0941
No report
2.59
pass
0953
No report
6.36
pass
1004½
No report
6.77
pass
1006½
No report
7.74
pass
1010
pass
1010
9.20
pass
1013½
No report
10.64
1
pass
1015½
pass
1014¾
13.42
pass
1019
pass
1018
16.38
2
pass
1022½
pass
1021¼
-1
20.36
2
pass
1027½
pass
1025¼
-2
22.76
2
pass
1030½
pass
1028½
-1
UH
USM
26.54
2
pass
1036
pass
1033½
-2
29.53
2
pass
1040½
pass
1042
+1
30.12
pass
1046
No report
30.76
pass
1047½
No report
33.53
pass
1052
No report
36.35
1057
1057½
No report
38.62
pass
1104½
pass
1102½
-1
UGO
40.07
1
pass
1107
pass
1104¾
-2
41.46
pass
1109
pass
1106¼
-2
41.73
1
pass
1109½
pass
1107½
-1
43.40
pass
1111½
pass
1109
-2
UG
45.58
pass
1116
pass
1113
-2
46.11
1
pass
1117½
pass
1122
+4
46.28
Knottingley West Jn
Service stops for pathing (passing train)
1118½
1122
N/R
1125¾
+3
UGO
DK
46.72
pass
1126
pass
1127¾
+1
DK
DPT