6D25 1152 Tunstead Sdgs (Fhh) to Radlett Redland Roadstone
Departing on 17th December 2024

This train runs as required

This service runs on an as required basis, and it has not yet been activated in the railway computer systems. This alert will disappear if the train is activated.

If the service should have departed by now, this normally means it is not running. If the train is set to run in the future, then check again closer to the time.

WTT
Route
Location
Pl
Arr
Dep
Path
Line
pass
1212
pass
1214½
2
pass
1226½
2
pass
1233½
2
pass
1235½
pass
1245½
pass
1248
pass
1300½
ML
2
pass
1301½
ML
pass
1305
pass
1312
pass
1316½
pass
1319½
ML
2
pass
1324
pass
1329½
pass
1332
Toton Centre
Service stops for pathing (passing train)
1339
1358
HL
pass
1401
HL
HL
pass
1406½
SL
pass
1408
pass
1413
USL
pass
1423½
SL
pass
1431½
pass
1432½
pass
1438½
pass
1450½
pass
1454½
Melton Mowbray Up Loop
Service stops for pathing (passing train)
1459½
1556
pass
1603½
pass
1611½
pass
1614
ML
pass
1615½
ML
pass
1620½
Corby Signal Km3974
Service stops for pathing (passing train)
1649
1649½
1
pass
1651½
pass
1710½
pass
1723½
Bedford [BDM]
½
Service stops for staffing reasons
1
1745½
1751
USL
pass
1754½
SL
pass
1757
pass
1808
1
pass
1808½
1
pass
1814
SUL
Sundon South Jn
Service stops for pathing (passing train)
1818
1822½
SL
pass
1829½
SL
pass
1833½
1
pass
1834
pass
1841½
pass
1842
pass
1850