2Y20 0813 Bargoed to Barry
Departing on 24th September 2024

operated by
Transport for Wales
2 coaches
153909
153318

This service is partially cancelled

This service was cancelled between Barry and Barry Island due to a problem with the traction equipment (MD).

GBTT
WTT
RTTRealtime
Route
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
Bargoed [BGD]
Pathed as Class 150/153/155/156 DMU at 75mph
1
0813
0813
0813
DR
2
0815
0816
0815
0816
0814¾
0815¼
2
0818
0819
0818
0819
0818¾
0819¼
2
0822
0822
0822
0822½
0822½
0823¼
1
0825
0825
0824½
0825½
0825
0853
+27
pass
0826½
pass
0854
+27
2
0830
0830
0829½
0830
pass
0857
+27
1
0833
0833
0833
0833½
0859½
0900¼
+26
Arriving
Aber [ABE]
2
0836
0836
0835½
0836½
0858½
0859
+22
2
0839
0839
0838
0839
pass
0900¼
+21
2
0843
0843
0843
0843½
pass
0903½
+20
2
0845
0846
0845
0846
0904¾
0905½
+19
2
0848
0848
0848
0848½
pass
0906¼
+17
pass
0849½
pass
0905½
+16
3
0854
0854
0853
0854½
0909
0910½
+16
DR
DL
pass
0856½
pass
0911
+14
8
0858
0859
0857
0859
0913
0916¼
+17
DL
DB
pass
0900½
No report
pass
0901
pass
0918½
+17
pass
0901½
pass
0919
+17
2
0903
0903
0902½
0903
pass
0920
+17
pass
0905½
pass
0922½
+17
2
0906
0907
0906
0907
pass
0922¾
+15
2
0909
0910
0909
0910
pass
0924¾
+14
2
0912
0912
0911½
0912½
pass
0925½
+13
2
0916
0917
0916
0917
pass
0928¼
+11
2
0919
0920
0919
0920
pass
0929¾
+9
3
0925
0925
0924½
0925½
0932¾
+8
DB