1S67 2050 London Waterloo to Windsor & Eton Riverside
Departing on 29th September 2024

operated by
South Western Railway
4 coaches
450082
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
16
2050
2050
2049¾
DW
0.40
pass
2051½
pass
2051½
DW
DWF
1.29
3
2054
2054
2053½
2054½
2053¼
2054¼
1.78
pass
2056
pass
2055½
DWF
DW
2.50
3
2057
2057
2057
2057½
2057
2057¾
DW
DWF
3.17
pass
2058½
pass
2058¾
3.74
5
2100
2100
2059½
2100½
2100½
2101
4.60
2
2103
2103
2102½
2103
2103
2103¾
5.72
3
2105
2106
2105
2106
2106
2106¾
7.07
3
2109
2109
2108½
2109
2109¼
2110¼
+1
DWF
DH
7.54
2
2111
2111
2110½
2111
2111¾
2112¾
+1
8.47
2
2113
2113
2113
2113½
2114¾
2115¼
+1
9.34
pass
2115
pass
2117
+2
9.53
2
2116
2116
2115½
2116
2117½
2118¼
+2
10.01
pass
2117
pass
2119
+2
10.52
2
2118
2119
2118
2119
2120¼
2121
+2
11.34
2
2121
2121
2120½
2121
2122½
2123½
+2
12.10
2
2123
2123
2122½
2123
2125
2125¾
+2
13.40
2
2126
2126
2125½
2126½
2128
2128¾
+2
14.19
pass
2128
pass
2130
+2
14.48
pass
2129
pass
2130¾
+1
DH
DT
16.01
2
2132
2132
2131½
2132½
2133¼
2134
+1
18.53
2
2136
2136
2136
2136½
2137½
2138¼
+1
20.15
2
2140
2140
2139½
2140½
2140¾
2141¾
+1
DT
DW
22.53
2
pass
2145
pass
2144½
23.61
pass
2146½
No report
24.76
2
pass
2148
pass
2149
+1
26.61
2
2152
2152
2153
+1