1U65 2024 London Waterloo to Windsor & Eton Riverside
Departing on 8th December 2024

operated by
South Western Railway
8 coaches
450063
450087
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
2024
2024
2037
+13
WR2
0.40
pass
2025½
pass
2038¼
+12
WR2
WR
1.29
1
2028
2028
2027½
2028½
2041
2042¼
+13
1.78
pass
2030
pass
2043¾
+13
WR
2.50
2
pass
2031½
pass
2046
+14
WR
DWS
3.17
pass
2032
pass
2047¼
+15
3.74
6
2034
2035
2033½
2035
2049
2049¾
+14
DWS
DWS
4.60
1
pass
2036½
pass
2051½
+15
5.72
4
2038
2039
2038
2039
2053½
2054½
+15
DS
7.07
4
pass
2041½
pass
2057
+15
DWS
DR
8.21
2
pass
2042½
pass
2058¾
+16
9.03
2
pass
2043½
pass
2059¾
+16
9.57
1
2045
2045
2044½
2045½
2100¾
2101¾
+16
DR
DT
10.66
3
pass
2047½
pass
2103¾
+16
11.22
5
2049
2049
2048½
2049½
2104½
2105¾
+16
11.49
pass
2050½
pass
2106½
+16
12.43
2
2052
2052
2052
2052½
2108
2109
+16
13.03
pass
2053½
pass
2110
+16
13.35
pass
2054
pass
2110¼
+16
14.68
2
2056
2057
2056
2057
2112¼
2113½
+16
17.40
2
2101
2101
2100½
2101
2117
2118
+17
19.02
2
2104
2105
2104
2105
2120½
2121¾
+16
DT
DW
21.40
2
pass
2108½
pass
2124½
+16
22.48
pass
2110
No report
23.63
2
2112
2113
2112
2113½
2128
2129
+15
25.48
1
2119
2119
2133
+14