2S07 0552 London Waterloo to Weybridge
Departing on 28th September 2024

operated by
South Western Railway
8 coaches
450063
450072
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
0552
0552
0551¾
WR1
0.40
pass
0553½
pass
0553¼
WR1
DWF
1.29
3
0556
0556
0555½
0556½
0555½
0556½
1.78
pass
0558
pass
0557½
DWF
DW
2.50
3
0559
0559
0559
0559½
0559
0559¾
DW
DWF
3.17
pass
0600½
pass
0600¾
3.74
5
0602
0602
0601½
0602½
0602¼
0602¾
4.60
2
0605
0605
0604½
0605
0604½
0605¼
5.72
3
0607
0608
0607
0608
0607¼
0608¼
7.07
3
0611
0612
0610½
0612½
0610½
0611¾
DWF
DH
7.54
2
0614
0614
0614
0614½
0613¼
0614
8.47
2
0617
0617
0616½
0617½
0616
0616¾
9.34
pass
0619
pass
0618¼
9.53
2
0620
0620
0619½
0620
0619
0619¾
10.01
pass
0621
pass
0620¼
10.52
2
0622
0623
0622
0623
0621¾
0622¾
11.34
2
0625
0625
0624½
0625
0624¼
0625¼
12.10
2
0627
0627
0626½
0627
0626¾
0627½
13.40
2
0630
0632
0629½
0632
0629¾
0631¾
14.19
pass
0633½
pass
0632¾
14.48
pass
0634½
pass
0633½
DH
DT
16.01
2
0638
0638
0637½
0638½
0637¼
0638¼
18.53
2
0642
0642
0642
0642½
0641¾
0642¾
20.15
2
0646
0646
0645½
0646½
0645½
0646
22.15
2
0651
0651
0650½
0651
0650½
0651¼
24.28
4
0655
0655
0655
0655½
0655
0655¾
DT
DC
26.68
1
0700
0701
0700
0701
0700¼
0701
28.22
1
0704
0704
0703½
0704
0703¼
0704¾
29.25
pass
0705½
pass
0706¼
30.05
Approaching
Weybridge [WYB]
1
0708
0708
0708¾
DC