2S21 0922 London Waterloo to Weybridge
Departing on 2nd October 2024

operated by
South Western Railway
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
0922
0922
0921¾
WR1
0.40
pass
0923½
pass
0923
WR1
DWF
1.29
3
0926
0926
0925½
0927½
0925½
0927¼
1.78
pass
0929
pass
0928¼
DWF
DW
2.50
3
0929
0929
0930
0930½
0929¾
0930½
DW
DWF
3.17
pass
0931½
pass
0931¼
3.74
5
0932
0932
0932½
0933½
0933
0933½
4.60
2
0935
0935
0935½
0936
0935¼
0936
5.72
3
0937
0938
0938
0939
0938
0939
DF
7.07
3
0942
0942
0941½
0942½
0941½
0942¼
DWF
DH
7.54
2
0944
0944
0944
0944½
0944
0944½
8.47
2
0947
0947
0946½
0947½
0946½
0947½
9.34
pass
0949
pass
0949
9.53
2
0950
0950
0949½
0950
0949¾
0950½
10.01
pass
0951
pass
0951
10.52
2
0952
0953
0952
0953
0952½
0953½
11.34
2
0955
0955
0954½
0955
0955¼
0955¾
12.10
2
0957
0957
0956½
0957
0957½
0958
+1
13.40
2
1000
1002
0959½
1002
1000½
1001¾
14.19
pass
1003½
pass
1002¾
14.48
pass
1004½
pass
1003½
DH
DT
16.01
2
1008
1008
1007½
1008½
1007
1008
18.53
2
1012
1012
1012
1012½
1012
1012¾
20.15
2
1016
1016
1015½
1016½
1015½
1016¼
22.15
2
1021
1021
1020½
1021
1020¾
1021¾
24.28
4
1025
1025
1025
1025½
1025¾
1026¼
DT
DC
26.68
1
1030
1031
1030
1031
1031
1031¾
28.22
1
1034
1034
1033½
1034
1034¼
1035
+1
29.25
pass
1035½
pass
1036½
+1
30.05
Approaching
Weybridge [WYB]
1
1038
1038
1039¼
+1
DC