2S33 1222 London Waterloo to Weybridge
Departing on 24th September 2024

operated by
South Western Railway
8 coaches
450119
450046
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
1222
1222
1222¼
DW
0.40
pass
1223½
pass
1224½
+1
DW
DWF
1.29
3
1226
1226
1225½
1226½
1226¼
1227½
+1
1.78
pass
1228
pass
1228½
DWF
DW
2.50
3
1229
1229
1229
1229½
1229¾
1230¾
+1
DW
DWF
3.17
pass
1230½
pass
1231¾
+1
3.74
5
1232
1233
1232
1233
1233¼
1234
+1
4.60
2
1235
1235
1235
1235½
1235¾
1236½
+1
5.72
3
1238
1238
1237½
1238½
1238¾
1239¾
+1
7.07
3
1241
1242
1241
1242½
1242
1243
DWF
DH
7.54
2
1244
1244
1244
1244½
1244¾
1245¼
8.47
2
1247
1247
1246½
1247½
1247¼
1248¼
9.34
pass
1249
pass
1249¾
9.53
2
1250
1250
1249½
1250
1250¼
1251
+1
10.01
pass
1251
pass
1251½
10.52
2
1252
1253
1252
1253
1253
1254
+1
11.34
2
1255
1255
1254½
1255
1255½
1256½
+1
12.10
2
1257
1257
1256½
1257
1258
1259
+2
13.40
2
1300
1302
1259½
1302
1301¼
1302¼
14.19
pass
1303½
pass
1303¼
14.48
pass
1304½
pass
1304
DH
DT
16.01
2
1308
1308
1307½
1308½
1308
1308¾
18.53
2
1312
1312
1312
1312½
1312¼
1313¼
20.15
2
1316
1316
1315½
1316½
1315¾
1316¾
22.15
2
1321
1321
1320½
1321
1321¼
1322¼
+1
24.28
4
1325
1325
1325
1325½
1326½
1327¼
+1
DT
DC
26.68
1
1330
1331
1330
1331
1331½
1332¾
+1
28.22
1
1334
1334
1333½
1334
1335
1336
+2
29.25
pass
1335½
pass
1337½
+2
30.05
Approaching
Weybridge [WYB]
1
1338
1338
1340¼
+2
DC