2S51 1652 London Waterloo to Weybridge
Departing on 25th September 2024

operated by
South Western Railway
8 coaches
450087
450068
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
19
1652
1652
1652
WR
0.40
pass
1653½
pass
1653½
WR
DWS
1.29
4
1656
1656
1655½
1656½
1655½
1656½
1.78
pass
1658
pass
1658
DWS
DW
2.50
3
1659
1659
1659
1659½
1659¼
1700
DW
DWF
3.17
pass
1700½
pass
1701
3.74
5
1702
1702
1701½
1702½
1702½
1703¼
4.60
2
1705
1705
1704½
1705
1705
1706
+1
5.72
3
1707
1708
1707
1708
1708¼
1709½
+1
7.07
3
1711
1712
1710½
1712½
1712
1713
DWF
DH
7.54
2
1714
1714
1714
1714½
1714¾
1715½
+1
8.47
2
1717
1717
1716½
1717½
1717½
1718½
+1
9.34
pass
1719
pass
1720
+1
9.53
2
1720
1720
1719½
1720
1720½
1721½
+1
10.01
pass
1721
pass
1722
+1
10.52
2
1722
1723
1722
1723
1723½
1724½
+1
11.34
2
1725
1725
1724½
1725
1726¼
1727¼
+2
12.10
2
1727
1727
1726½
1727
1728¾
1730
+3
13.40
2
1730
1732
1729½
1732
1732¼
1733¼
+1
14.19
pass
1733½
pass
1734¼
14.48
pass
1734½
pass
1735
DH
DT
16.01
2
1738
1738
1737½
1738½
1737¾
1738¾
18.53
2
1742
1742
1742
1742½
1742¼
1743½
+1
20.15
2
1746
1746
1745½
1746½
1746¼
1747¼
22.15
2
1751
1751
1750½
1751
1751¾
1753
+2
24.28
4
1755
1755
1755
1755½
1757½
1758½
+3
DT
DC
26.68
1
1800
1801
1800
1801
1803
1804¼
+3
28.22
1
1804
1804
1803½
1804
1806¾
1808
+4
29.25
pass
1805½
pass
1809¾
+4
30.05
Approaching
Weybridge [WYB]
1
1815
1813
1813¾
DC