2U21 0933 London Waterloo to Windsor & Eton Riverside
Departing on 13th September 2024

operated by
South Western Railway
8 coaches
450085
450070
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
20
0933
0933
0933¼
WR1
0.40
pass
0934½
pass
0934¼
WR1
DWF
1.29
3
0937
0937
0936½
0937½
0936½
0937¾
1.78
pass
0939
pass
0938¾
DWF
DW
2.50
3
pass
0940
pass
0939¾
DW
DWS
3.17
pass
0940½
pass
0940¼
3.74
6
0942
0943
0942
0943
0944¾
0945¾
+2
DWS
DWS
4.60
1
pass
0944½
pass
0947½
+3
5.72
4
0946
0947
0946
0947
0949
0949¾
+2
7.07
4
pass
0949
pass
0952
+3
DWS
DR
8.21
2
pass
0950
pass
0953
+2
9.03
2
pass
0951
pass
0953¾
+3
9.57
1
0952
0953
0952
0953
0954¾
0956
+3
DR
DT
10.66
3
pass
0955
pass
0957¾
+2
11.22
5
0956
0957
0956
0957
0958¾
0959¾
+2
11.49
pass
0958
pass
1000½
+2
12.43
2
1000
1000
0959½
1000
1002
1002¾
+2
13.03
pass
1001
pass
1003¾
+2
13.35
pass
1001½
pass
1004
+2
14.68
2
1004
1004
1003½
1004½
1006
1007
+2
17.40
2
1008
1008
1008
1008½
1010½
1011¼
+2
19.02
2
1011
1012
1011½
1012½
1013¾
1014¾
+2
DT
DW
21.40
2
1016
1016
1016
1016½
1018
1019
+2
22.48
2
1019
1019
1018½
1019
1021
1022
+3
23.63
2
1022
1022
1021½
1022
1024
1024
+2
25.48
1
1026
1026
1028
+2