2U21 0933 London Waterloo to Windsor & Eton Riverside
Departing on 19th November 2024

operated by
South Western Railway
8 coaches
450035
450057
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
0933
0933
0936¾
+3
WR
0.40
pass
0934½
pass
0939¼
+4
WR
DWF
1.29
3
0937
0937
0936½
0937½
0942
0943¼
+5
1.78
pass
0939
pass
0944½
+5
DWF
DW
2.50
3
pass
0940
pass
0945¾
+5
DW
DWS
3.17
pass
0940½
pass
0946½
+5
3.74
6
0942
0943
0942
0943
0948
0949
+6
DWS
DWS
4.60
1
pass
0944½
pass
0950¾
+6
5.72
4
0946
0947
0946
0947
0952½
0953½
+6
7.07
4
pass
0949
pass
0955½
+6
DWS
DR
8.21
2
pass
0950
pass
0956½
+6
9.03
2
pass
0951
pass
0957¼
+6
9.57
1
0952
0953
0952
0953
0958½
1000
+7
DR
DT
10.66
3
pass
0955
pass
1001¾
+7
11.22
5
0956
0957
0956
0957
1002¾
1004
+7
11.49
pass
0958
pass
1004¾
+6
12.43
2
1000
1000
0959½
1000
1006¼
1007¼
+7
13.03
pass
1001
pass
1008¼
+7
13.35
pass
1001½
pass
1008¾
+7
14.68
2
1004
1004
1003½
1004½
1010¾
1012¼
+7
17.40
2
1008
1008
1008
1008½
1015½
1016½
+8
19.02
2
1011
1012
1011½
1012½
1019
1020¼
+7
DT
DW
21.40
2
1016
1017
1016
1017
1023
1024
+7
22.48
2
1019
1020
1019
1020
1027
1028
+8
23.63
2
1023
1024
1022½
1024
1030
1031
+7
25.48
1
1029
1029
1035
+6