2U23 1003 London Waterloo to Windsor & Eton Riverside
Departing on 23rd September 2024

operated by
South Western Railway
8 coaches
450028
450123
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1003
1003
1008¾
+5
WR1
0.40
pass
1004½
pass
1010
+5
WR1
DWF
1.29
3
1007
1007
1006½
1007½
1012¼
1013¼
+5
1.78
pass
1009
pass
1014¼
+5
DWF
DW
2.50
3
pass
1010
pass
1015¼
+5
DW
DWS
3.17
pass
1010½
pass
1015¾
+5
3.74
6
1012
1013
1012
1013
1017¼
1018½
+5
DWS
DWS
4.60
1
pass
1014½
pass
1020¾
+6
5.72
4
1016
1017
1016
1017
1022½
1023½
+6
7.07
4
pass
1019
pass
1030½
+11
DWS
DR
8.21
2
pass
1020
pass
1035
+14
9.03
2
pass
1021
pass
1037½
+16
9.57
1
1022
1023
1022
1023
1038¾
1039¾
+16
DR
DT
10.66
3
pass
1025
pass
1041½
+16
11.22
5
1026
1027
1026
1027
1042¾
1044
+17
11.49
pass
1028
pass
1044¾
+16
12.43
2
1030
1030
1029½
1030
1046
1047
+17
13.03
pass
1031
pass
1048
+17
13.35
pass
1031½
pass
1048¼
+16
14.68
2
1034
1034
1033½
1034½
1050¼
1051
+16
17.40
2
1038
1038
1038
1038½
1054½
1055¼
+16
19.02
2
1041
1042
1041½
1042½
1057¾
1058¾
+16
DT
DW
21.40
2
1046
1047
1046
1047
1102
1103
+16
22.48
2
1049
1050
1049
1050
1105
1106
+16
23.63
2
1053
1054
1052½
1054
1108
1109
+15
25.48
1
1059
1059
1113
+14