2U25 1033 London Waterloo to Windsor & Eton Riverside
Departing on 25th June 2024

operated by
South Western Railway
8 coaches
450044
450111
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
24
1033
1033
1033
WR1
0.40
pass
1034½
pass
1037¼
+2
WR1
DWF
1.29
3
1037
1037
1036½
1037½
1040
1041¼
+3
1.78
pass
1039
pass
1042½
+3
DWF
DW
2.50
3
pass
1040
pass
1043½
+3
DW
DWS
3.17
pass
1040½
pass
1044
+3
3.74
6
1042
1043
1042
1043
1045½
1046¾
+3
DWS
DWS
4.60
1
pass
1044½
pass
1048½
+4
5.72
4
1046
1047
1046
1047
1050
1051
+4
7.07
4
pass
1049
pass
1053
+4
DWS
DR
8.21
2
pass
1050
pass
1054¼
+4
9.03
2
pass
1051
pass
1055
+4
9.57
1
1052
1053
1052
1053
1056
1057½
+4
DR
DT
10.66
3
pass
1055
pass
1059½
+4
11.22
5
1056
1057
1056
1057
1100¼
1101½
+4
11.49
pass
1058
pass
1102¼
+4
12.43
2
1100
1100
1059½
1100
1103¾
1105
+5
13.03
pass
1101
pass
1106
+5
13.35
pass
1101½
pass
1106¼
+4
14.68
2
1104
1104
1103½
1104½
1108¼
1109¾
+5
17.40
2
1108
1108
1108
1108½
1113¼
1114
+5
19.02
2
1111
1112
1111½
1112½
1116¾
1117¾
+5
DT
DW
21.40
2
1116
1116
1116
1116½
1121
1122
+5
22.48
2
1119
1119
1118½
1119
1124
1125
+6
23.63
2
1122
1122
1121½
1122
1127
1128
+6
25.48
1
1126
1126
1132
+6