2U25 1033 London Waterloo to Windsor & Eton Riverside
Departing on 9th December 2024

operated by
South Western Railway
8 coaches
450039
450117
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
24
1033
1033
1033¾
WR1
0.40
pass
1034½
pass
1035
WR1
DWF
1.29
3
1037
1037
1036½
1037½
1038¼
1039¼
+1
1.78
pass
1039
pass
1040½
+1
DWF
DW
2.50
3
pass
1040
pass
1042¼
+2
DW
DWS
3.17
pass
1040½
pass
1043½
+2
3.74
6
1042
1043
1042
1043
1047¾
1049¼
+6
DWS
DWS
4.60
1
pass
1044½
pass
1050¾
+6
5.72
4
1046
1047
1046
1047
1052¾
1053¾
+6
DS
7.07
4
pass
1049
pass
1055¾
+6
DWS
DR
8.21
2
pass
1050
pass
1057
+6
9.03
2
pass
1051
pass
1057¾
+7
9.57
1
1052
1053
1052
1053
1058¾
1100
+7
DR
DT
10.66
3
pass
1055
pass
1102
+7
11.22
5
1056
1057
1056
1057
1102¾
1104
+7
11.49
pass
1058
pass
1104¾
+6
12.43
2
1100
1100
1059½
1100
1106¼
1107¼
+7
13.03
pass
1101
pass
1108¼
+7
13.35
pass
1101½
pass
1108¾
+7
14.68
2
1104
1104
1103½
1104½
1110½
1111¾
+7
17.40
2
1108
1108
1108
1108½
1115¼
1116¼
+7
19.02
2
1111
1112
1111½
1112½
1118¾
1119¾
+7
DT
DW
21.40
2
1116
1117
1116
1117
1123
1124
+7
22.48
2
1119
1120
1119
1120
1126
1127
+7
23.63
2
1123
1124
1122½
1124
1129
1130
+6
25.48
1
1129
1129
1134
+5