2U27 1103 London Waterloo to Windsor & Eton Riverside
Departing on 23rd November 2024

operated by
South Western Railway
8 coaches
450050
450029
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1103
1103
1103½
WR1
0.40
pass
1104½
pass
1104¾
WR1
DWF
1.29
3
1107
1107
1106½
1107½
1107¾
1109¼
+1
1.78
pass
1109
pass
1110¾
+1
DWF
DW
2.50
3
pass
1110
pass
1111¾
+1
DW
DWS
3.17
pass
1110½
pass
1112¼
+1
3.74
6
1112
1113
1112
1113
1113¾
1114¾
+1
DWS
DWS
4.60
1
pass
1114½
pass
1116½
+2
5.72
4
1116
1117
1116
1117
1118¼
1119¼
+2
7.07
4
pass
1119
pass
1121¾
+2
DWS
DR
8.21
2
pass
1120
pass
1123½
+3
9.03
2
pass
1121
pass
1124¼
+3
9.57
1
1122
1123
1122
1123
1125¼
1126¾
+3
DR
DT
10.66
3
pass
1125
pass
1128¾
+3
11.22
5
1126
1127
1126
1127
1129¾
1130¾
+3
11.49
pass
1128
pass
1131½
+3
12.43
2
1130
1130
1129½
1130
1133
1134¼
+4
13.03
pass
1131
pass
1135¼
+4
13.35
pass
1131½
pass
1135½
+4
14.68
2
1134
1134
1133½
1134½
1137¾
1138¾
+4
17.40
2
1138
1138
1138
1138½
1142¼
1143½
+5
19.02
2
1141
1142
1141½
1142½
1146
1147¼
+4
DT
DW
21.40
2
1146
1147
1146
1147
1150
1152
+5
22.48
2
1149
1150
1149
1150
1154
1155
+5
23.63
2
1153
1154
1152½
1154
1157
1158
+4
25.48
1
1159
1159
1202
+3