2U33 1233 London Waterloo to Windsor & Eton Riverside
Departing on 5th October 2024

operated by
South Western Railway
8 coaches
450095
450010
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
24
1233
1233
1233
WR1
0.40
pass
1234½
pass
1234¼
WR1
DWF
1.29
3
1237
1237
1236½
1237½
1236¼
1237¾
1.78
pass
1239
pass
1238¾
DWF
DW
2.50
3
pass
1240
pass
1240
DW
DWS
3.17
pass
1240½
pass
1240¼
3.74
6
1242
1243
1242
1243
1241¾
1243
DWS
DWS
4.60
1
pass
1244½
pass
1244½
5.72
4
1246
1247
1246
1247
1246¼
1247¼
7.07
4
pass
1249
pass
1249¼
DWS
DR
8.21
2
pass
1250
pass
1250¼
9.03
2
pass
1251
pass
1251
9.57
1
1252
1253
1252
1253
1252¼
1254
+1
DR
DT
10.66
3
pass
1255
pass
1255¾
+1
11.22
5
1256
1257
1256
1257
1256¾
1257¾
11.49
pass
1258
pass
1258½
12.43
2
1300
1300
1259½
1300
1300
1301
+1
13.03
pass
1301
pass
1302
+1
13.35
pass
1301½
pass
1302½
+1
14.68
2
1304
1304
1303½
1304½
1304½
1305½
+1
17.40
2
1308
1308
1308
1308½
1309
1309¾
+1
19.02
2
1311
1312
1311½
1312½
1312¼
1313½
+1
DT
DW
21.40
2
1316
1317
1316
1317
1317
1317
22.48
2
1319
1320
1319
1320
1320
1320
23.63
2
1323
1324
1322½
1324
1322
1323
-1
25.48
2
1329
1329
1328
-1