2U39 1403 London Waterloo to Windsor & Eton Riverside
Departing on 19th November 2024

operated by
South Western Railway
10 coaches
701039
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
20
1403
1403
1402¾
WR1
0.40
pass
1404½
pass
1404
WR1
DWF
1.29
3
1407
1407
1406½
1407½
1406¼
1407½
1.78
pass
1409
pass
1408¾
DWF
DW
2.50
3
pass
1410
pass
1409¾
DW
DWS
3.17
pass
1410½
pass
1410¼
3.74
6
1412
1413
1412
1413
1414½
1415½
+2
DWS
DWS
4.60
1
pass
1414½
pass
1417
+2
5.72
4
1416
1417
1416
1417
1418¾
1419½
+2
7.07
4
pass
1420
pass
1421¾
+1
DWS
DR
8.21
2
pass
1421
pass
1423
+2
9.03
2
pass
1422
pass
1424
+2
9.57
1
1423
1424
1423
1424
1425
1426¼
+2
DR
DT
10.66
3
pass
1426
pass
1428
+2
11.22
5
1427
1428
1427
1428
1429
1430
+2
11.49
pass
1429
pass
1430½
+1
12.43
2
1431
1431
1430½
1431
1432
1433¼
+2
13.03
pass
1432
pass
1434¼
+2
13.35
pass
1432½
pass
1434½
+2
14.68
2
1435
1435
1434½
1435½
1436½
1437½
+2
17.40
2
1439
1439
1439
1439½
1441
1441¾
+2
19.02
2
1443
1445
1444
1445
1444¼
1445¼
DT
DW
21.40
2
1449
1449
1448½
1449½
1448
1449
22.48
2
1452
1452
1451½
1452½
1452
1452
23.63
2
1455
1456
1455
1456½
1454
1455
-1
25.48
1
1502
1502
1459
-3