2U41 1433 London Waterloo to Windsor & Eton Riverside
Departing on 30th September 2024

operated by
South Western Railway
8 coaches
450003
450057
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
19
1433
1433
1432¾
WR
0.40
pass
1434½
pass
1434
WR
DWF
1.29
3
1437
1437
1436½
1437½
1436¼
1437
1.78
pass
1439
pass
1438¼
DWF
DW
2.50
3
pass
1440
pass
1439¼
DW
DWS
3.17
pass
1440½
pass
1439½
3.74
6
1442
1443
1442
1443
1441
1442½
DWS
DWS
4.60
1
pass
1444½
pass
1444¼
5.72
4
1446
1447
1446
1447
1445¾
1446½
7.07
4
pass
1449
pass
1448½
DWS
DR
8.21
2
pass
1450
pass
1449½
9.03
2
pass
1451
pass
1450¼
9.57
1
1452
1453
1452
1453
1451¼
1455
+2
DR
DT
10.66
3
pass
1455
pass
1456¾
+2
11.22
5
1456
1457
1456
1457
1457¾
1458½
+1
11.49
pass
1458
pass
1459¼
+1
12.43
2
1500
1500
1459½
1500
1500¾
1501½
+1
13.03
pass
1501
pass
1502½
+1
13.35
pass
1501½
pass
1502¾
+1
14.68
2
1504
1504
1503½
1504½
1505
1505¾
+1
17.40
2
1508
1508
1508
1508½
1509
1509¾
+1
19.02
2
1511
1512
1511½
1512½
1512¼
1512¾
DT
DW
21.40
2
1516
1517
1516
1517
1516
1517
22.48
2
1519
1520
1519
1520
1519
1519
-1
23.63
2
1523
1524
1522½
1524
1522
1522
-2
25.48
2
1529
1529
1526
-3