2U43 1503 London Waterloo to Windsor & Eton Riverside
Departing on 21st November 2024

operated by
South Western Railway
8 coaches
450024
450023
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1503
1503
1503
WR1
0.40
pass
1504½
pass
1504
WR1
DWF
1.29
3
1507
1507
1506½
1507½
1506¾
1507¾
1.78
pass
1509
pass
1509
DWF
DW
2.50
3
pass
1510
pass
1510
DW
DWS
3.17
pass
1510½
pass
1510¾
3.74
6
1512
1513
1512
1513
1512¼
1513
DWS
DWS
4.60
1
pass
1514½
pass
1514½
5.72
4
1516
1517
1516
1517
1516¼
1517
7.07
4
pass
1519
pass
1519¼
DWS
DR
8.21
2
pass
1520
pass
1520¼
9.03
2
pass
1521
pass
1521
9.57
1
1522
1523
1522
1523
1522
1523½
DR
DT
10.66
3
pass
1525
pass
1525¼
11.22
5
1526
1527
1526
1527
1526¼
1527¼
11.49
pass
1528
pass
1528
12.43
2
1530
1530
1529½
1530
1529½
1530¾
13.03
pass
1531
pass
1531¾
13.35
pass
1531½
pass
1532¼
14.68
2
1534
1534
1533½
1534½
1534¼
1535½
+1
17.40
2
1538
1538
1538
1538½
1539¼
1540¼
+1
19.02
2
1541
1542
1541½
1542½
1542¾
1544
+1
DT
DW
21.40
2
1546
1547
1546
1547
1547
1548
+1
22.48
2
1549
1550
1549
1550
1550
1552
+2
23.63
2
1553
1554
1552½
1554
1554
1554