2U43 1503 London Waterloo to Windsor & Eton Riverside
Departing on 13th December 2024

operated by
South Western Railway
8 coaches
450110
450072
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1503
1503
1503¼
WR1
0.40
pass
1504½
pass
1504½
WR1
DWF
1.29
3
1507
1507
1506½
1507½
1506½
1508
1.78
pass
1509
pass
1509
DWF
DW
2.50
3
pass
1510
pass
1510¼
DW
DWF
3.17
pass
1510½
pass
1511¼
3.74
5
1512
1513
1512
1513
1512¾
1513¾
4.60
2
pass
1514½
pass
1515½
+1
5.72
3
1516
1517
1516
1517
1517¼
1518¼
+1
DF
7.07
3
pass
1519
pass
1520¼
+1
DWF
DR
8.21
2
pass
1520
pass
1521½
+1
9.03
2
pass
1521
pass
1522¼
+1
9.57
1
1522
1523
1522
1523
1523½
1524¾
+1
DR
DT
10.66
3
pass
1525
pass
1526½
+1
11.22
5
1526
1527
1526
1527
1527½
1528¾
+1
11.49
pass
1528
pass
1529½
+1
12.43
2
1530
1530
1529½
1530
1531
1532
+2
13.03
pass
1531
pass
1533
+2
13.35
pass
1531½
pass
1533½
+2
14.68
2
1534
1534
1533½
1534½
1535¾
1537
+2
17.40
2
1538
1538
1538
1538½
1540¾
1541¾
+3
19.02
2
1541
1542
1541½
1542½
1544¾
1546
+3
DT
DW
21.40
2
1546
1547
1546
1547
1549
1551
+4
22.48
2
1549
1550
1549
1550
1553
1554
+4
23.63
2
1553
1554
1552½
1554
1557
1557
+3
25.48
1
1559
1559
1602
+3