2U53 1733 London Waterloo to Windsor & Eton Riverside
Departing on 1st October 2024

operated by
South Western Railway
8 coaches
450073
450120
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
1733
1733
1733½
WR1
0.40
pass
1734½
pass
1734½
WR1
DWF
1.29
3
1737
1737
1736½
1737½
1736½
1739¼
+1
1.78
pass
1739
pass
1740
+1
UD
2.50
3
pass
1740
pass
1741½
+1
DW
DWS
3.17
pass
1740½
pass
1742
+1
3.74
6
1742
1743
1742
1743
1743¼
1745¼
+2
DWS
DWS
4.60
1
pass
1744½
pass
1747
+2
5.72
4
1746
1747
1746
1747
1748¾
1750
+3
7.07
4
pass
1749
pass
1752
+3
DWS
DR
8.21
2
pass
1750
pass
1753¼
+3
9.03
2
pass
1751
pass
1754
+3
9.57
1
1752
1753
1752
1753
1755
1757
+4
DR
DT
10.66
3
pass
1755
pass
1758¾
+3
11.22
5
1756
1757
1756
1757
1759½
1801
+4
11.49
pass
1758
pass
1801¾
+4
12.43
2
1800
1800
1759½
1800
1803¼
1804¼
+4
13.03
pass
1801
pass
1805½
+4
13.35
pass
1801½
pass
1805¾
+4
14.68
2
1804
1804
1803½
1804½
1807¾
1809
+4
17.40
2
1808
1808
1808
1808½
1812½
1813¾
+5
19.02
2
1811
1812
1811½
1812½
1816¼
1817¼
+4
DT
DW
21.40
2
1816
1817
1816
1817
1821
1821
+4
22.48
2
1819
1820
1819
1820
1824
1824
+4
23.63
2
1823
1824
1822½
1824
1827
1827
+3
25.48
1
1831
1829
1831
+2