2U55 1803 London Waterloo to Windsor & Eton Riverside
Departing on 3rd October 2024

operated by
South Western Railway
8 coaches
450049
450050
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
1803
1803
1803
WR1
0.40
pass
1804½
pass
1804½
WR1
DWF
1.29
3
1807
1807
1806½
1807½
1807
1808½
+1
1.78
pass
1809
pass
1809½
DWF
DW
2.50
3
pass
1810
pass
1810¾
DW
DWS
3.17
pass
1810½
pass
1811¼
3.74
6
1812
1813
1812
1813
1812¾
1814¼
+1
DWS
DWS
4.60
1
pass
1814½
pass
1816
+1
5.72
4
1816
1817
1816
1817
1817¾
1819
+2
7.07
4
pass
1819
pass
1821
+2
DWS
DR
8.21
2
pass
1820
pass
1822¼
+2
9.03
2
pass
1821
pass
1823
+2
9.57
1
1822
1823
1822
1823
1824
1825¾
+2
DR
DT
10.66
3
pass
1825
pass
1827½
+2
11.22
5
1826
1827
1826
1827
1828¼
1829¾
+2
11.49
pass
1828
pass
1830½
+2
12.43
2
1830
1830
1829½
1830
1832
1833
+3
13.03
pass
1831
pass
1834
+3
13.35
pass
1831½
pass
1834½
+3
14.68
2
1834
1834
1833½
1834½
1836½
1838
+3
17.40
2
1838
1838
1838
1838½
1841½
1842¼
+3
19.02
2
1841
1842
1841½
1842½
1845
1846
+3
DT
DW
21.40
2
1846
1847
1846
1847
1849
1850
+3
22.48
2
1849
1850
1849
1850
1852
1853
+3
23.63
2
1853
1854
1852½
1854
1854
1855
+1