2U61 1933 London Waterloo to Windsor & Eton Riverside
Departing on 28th November 2024

operated by
South Western Railway
10 coaches
701039
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
18
1933
1933
1932¾
DW
0.40
pass
1934½
pass
1934½
DW
DWS
1.29
4
1937
1937
1936½
1937½
1936¾
1940¾
+3
1.78
pass
1939
pass
1942¼
+3
DWS
DW
2.50
3
pass
1940
pass
1943½
+3
DW
DWS
3.17
pass
1940½
pass
1944
+3
3.74
6
1942
1943
1942
1943
1945½
1946¼
+3
DWS
DWS
4.60
1
pass
1944½
pass
1948
+3
5.72
4
1946
1947
1946
1947
1949¾
1950½
+3
7.07
4
pass
1949
pass
1952½
+3
DWS
DR
8.21
2
pass
1950
pass
1953¾
+3
9.03
2
pass
1951
pass
1954½
+3
9.57
1
1952
1953
1952
1953
1955½
1956¾
+3
DR
DT
10.66
3
pass
1955
pass
1958½
+3
11.22
5
1956
1957
1956
1957
1959½
2000½
+3
11.49
pass
1958
pass
2001¼
+3
12.43
2
2000
2000
1959½
2000
2002½
2003½
+3
13.03
pass
2001
pass
2004½
+3
13.35
pass
2001½
pass
2004¾
+3
14.68
2
2004
2004
2003½
2004½
2006¾
2007½
+3
17.40
2
2008
2008
2008
2008½
2010¾
2011¾
+3
19.02
2
2011
2012
2011½
2012½
2014¼
2015¼
+2
DT
DW
21.40
2
2016
2017
2016
2017
2018
2019
+2
22.48
2
2019
2020
2019
2020
2021
N/R
+2
23.63
2
2023
2024
2022½
2024
N/R
2025
+1