2U63 2003 London Waterloo to Windsor & Eton Riverside
Departing on 25th November 2024

operated by
South Western Railway
8 coaches
450024
450099
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
24
2003
2003
2003
WR1
0.40
pass
2004½
pass
2004¼
WR1
DWF
1.29
3
2007
2007
2006½
2007½
2006½
2007¾
1.78
pass
2009
pass
2009
DWF
DW
2.50
3
pass
2010
pass
2010
DW
DWS
3.17
pass
2010½
pass
2010½
3.74
6
2012
2013
2012
2013
2012
2013
DWS
DWS
4.60
1
pass
2014½
pass
2014½
5.72
4
2016
2017
2016
2017
2016½
2017½
7.07
4
pass
2019
pass
2020¼
+1
DWS
DR
8.21
2
pass
2020
pass
2022¼
+2
9.03
2
pass
2021
pass
2023
+2
9.57
1
2022
2023
2022
2023
2024¼
2025½
+2
DR
DT
10.66
3
pass
2025
pass
2027¼
+2
11.22
5
2026
2027
2026
2027
2028
2029¼
+2
11.49
pass
2028
pass
2030
+2
12.43
2
2030
2030
2029½
2030
2031½
2032½
+2
13.03
pass
2031
pass
2033½
+2
13.35
pass
2031½
pass
2034
+2
14.68
2
2034
2034
2033½
2034½
2036¼
2037½
+3
17.40
2
2038
2038
2038
2038½
2041
2042¼
+3
19.02
2
2041
2042
2041½
2042½
2044¾
2046
+3
DT
DW
21.40
2
2046
2047
2046
2047
2049
2050
+3
22.48
2
2049
2050
2049
2050
2053
2054
+4
23.63
2
2053
2054
2052½
2054
2056
2057
+3
25.48
2
2059
2059
2101
+2