2U65 2033 London Waterloo to Windsor & Eton Riverside
Departing on 20th September 2024

operated by
South Western Railway
8 coaches
450036
450084
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
2033
2033
2033
WR1
0.40
pass
2034½
pass
2034¼
WR1
DWF
1.29
3
2037
2037
2036½
2037½
2037
2037¾
1.78
pass
2039
pass
2039
DWF
DW
2.50
3
pass
2040
pass
2040
DW
DWS
3.17
pass
2040½
pass
2040¾
3.74
6
2042
2043
2042
2043
2042¼
2043
DWS
DWS
4.60
1
pass
2044½
pass
2044½
5.72
4
2046
2047
2046
2047
2046¼
2047½
7.07
4
pass
2049
pass
2049½
DWS
DR
8.21
2
pass
2050
pass
2050¾
9.03
2
pass
2051
pass
2051½
9.57
1
2052
2053
2052
2053
2052¾
2053¾
DR
DT
10.66
3
pass
2055
pass
2055½
11.22
5
2056
2057
2056
2057
2056½
2057¼
11.49
pass
2058
pass
2058
12.43
2
2100
2100
2059½
2100
2059½
2100¼
13.03
pass
2101
pass
2101¼
13.35
pass
2101½
pass
2101½
14.68
2
2104
2104
2103½
2104½
2103¾
2104¾
17.40
2
2108
2108
2108
2108½
2108¼
2109
19.02
2
2111
2112
2111½
2112½
2111½
2112½
DT
DW
21.40
2
2116
2116
2116
2116½
2116
2116
22.48
2
2119
2119
2118½
2119
2119
2119
23.63
2
2122
2122
2121½
2122
2121
2122
25.48
2
2126
2126
2127
+1