2U67 2103 London Waterloo to Windsor & Eton Riverside
Departing on 15th November 2024

operated by
South Western Railway
8 coaches
450071
450029
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
22
2103
2103
2103
WR1
0.40
pass
2104½
pass
2104¼
WR1
DWF
1.29
3
2107
2107
2106½
2107½
2106½
2107¾
1.78
pass
2109
pass
2108¾
DWF
DW
2.50
3
pass
2110
pass
2109¾
DW
DWF
3.17
pass
2110½
pass
2110½
3.74
5
2112
2113
2112
2113
2112½
2113½
4.60
2
pass
2114½
pass
2115½
+1
DWF
DWS
5.72
4
2116
2117
2116
2117
2118¼
2119¼
+2
7.07
4
pass
2119
pass
2121¼
+2
DWS
DR
8.21
2
pass
2120
pass
2122¼
+2
9.03
2
pass
2121
pass
2123¼
+2
9.57
1
2122
2123
2122
2123
2124¼
2125¼
+2
DR
DT
10.66
3
pass
2125
pass
2127
+2
11.22
5
2126
2127
2126
2127
2127¾
2128¾
+1
11.49
pass
2128
pass
2129½
+1
12.43
2
2130
2130
2129½
2130
2131
2131¾
+1
13.03
pass
2131
pass
2132¾
+1
13.35
pass
2131½
pass
2133¼
+1
14.68
2
2134
2134
2133½
2134½
2135
2136
+1
17.40
2
2138
2138
2138
2138½
2139¼
2140
+1
19.02
2
2141
2142
2141½
2142½
2142¾
2143¾
+1
DT
DW
21.40
2
2146
2147
2146
2147
2147
2148
+1
22.48
2
2149
2150
2149
2150
2150
2151
+1
23.63
2
2153
2154
2152½
2154
2153
2154
25.48
1
2159
2159
2158
-1