2U67 2103 London Waterloo to Windsor & Eton Riverside
Departing on 23rd November 2024

operated by
South Western Railway
8 coaches
450050
450029
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
2103
2103
2104½
+1
WR2
0.40
pass
2104½
pass
2105½
+1
WR2
WR
1.29
1
2107
2107
2106½
2107½
2107¾
2110
+2
1.78
pass
2109
pass
2111¼
+2
WR
2.50
2
pass
2110
pass
2114¾
+4
WR
DWS
3.17
pass
2110½
pass
2116¼
+5
3.74
6
2112
2113
2112
2113
2118
2119
+6
DWS
DWS
4.60
1
pass
2114½
pass
2120½
+6
5.72
4
2116
2117
2116
2117
2122¼
2123½
+6
7.07
4
pass
2119
pass
2125¾
+6
DWS
DR
8.21
2
pass
2120
pass
2126¾
+6
9.03
2
pass
2121
pass
2127½
+6
9.57
1
2122
2123
2122
2123
2128¾
2130¼
+7
DR
DT
10.66
3
pass
2125
pass
2132
+7
11.22
5
2126
2127
2126
2127
2133
2134¼
+7
11.49
pass
2128
pass
2134¾
+7
12.43
2
2130
2130
2129½
2130
2136½
2137¾
+7
13.03
pass
2131
pass
2138¾
+7
13.35
pass
2131½
pass
2139
+7
14.68
2
2134
2134
2133½
2134½
2141
2142½
+8
17.40
2
2138
2138
2138
2138½
2146
2147
+8
19.02
2
2141
2142
2141½
2142½
2149½
2150½
+8
DT
DW
21.40
2
2146
2147
2146
2147
2154
2155
+8
22.48
2
2149
2150
2149
2150
2158
2159
+9
23.63
2
2153
2154
2152½
2154
2201
2202
+8
25.48
1
2159
2159
2206
+7