2U71 2203 London Waterloo to Windsor & Eton Riverside
Departing on 18th September 2024

operated by
South Western Railway
8 coaches
450091
450054
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
19
2203
2203
2203
DW
0.40
pass
2204½
pass
2204¾
DW
DWF
1.29
3
2207
2207
2206½
2207½
2206½
2207¾
1.78
pass
2209
pass
2208¾
DWF
DW
2.50
3
pass
2210
pass
2209¾
DW
DWS
3.17
pass
2210½
pass
2210¼
3.74
6
2212
2213
2212
2213
2211¾
2212¾
DWS
DWS
4.60
1
pass
2214½
pass
2214½
5.72
4
2216
2217
2216
2217
2216
2217¼
7.07
4
pass
2219
pass
2219¼
DWS
DR
8.21
2
pass
2220
pass
2220¼
9.03
2
pass
2221
pass
2221
9.57
1
2222
2223
2222
2223
2222¼
2223½
DR
DT
10.66
3
pass
2225
pass
2225¼
11.22
5
2226
2227
2226
2227
2226¼
2231
+4
11.49
pass
2228
pass
2231¾
+3
12.43
2
2230
2230
2229½
2230
2233¼
2234½
+4
13.03
pass
2231
pass
2235½
+4
13.35
pass
2231½
pass
2235¾
+4
14.68
2
2234
2234
2233½
2234½
2237¾
2238½
+4
17.40
2
2238
2238
2238
2238½
2242
2242¾
+4
19.02
2
2241
2242
2241½
2242½
2245¼
2246
+3
DT
DW
21.40
2
2246
2246
2246
2246½
2249
2250
+3
22.48
2
2249
2249
2248½
2249
2252
2253
+4
23.63
2
2252
2252
2251½
2252
2255
2256
+4
25.48
1
2256
2256
2300
+4