2U75 2303 London Waterloo to Windsor & Eton Riverside
Departing on 18th September 2024

operated by
South Western Railway
8 coaches
450109
450121
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
21
2303
2303
2302¾
WR1
0.40
pass
2304½
pass
2304
WR1
DWF
1.29
3
2307
2307
2306½
2307½
2306
2307½
1.78
pass
2309
pass
2308½
DWF
DW
2.50
3
pass
2310
pass
2310
DW
DWS
3.17
pass
2310½
pass
2310¾
3.74
6
2312
2313
2312
2313
2312¼
2313¼
DWS
DWS
4.60
1
pass
2314½
pass
2314¾
5.72
4
2316
2317
2316
2317
2316½
2317¼
7.07
4
pass
2319
pass
2319¼
DWS
DR
8.21
2
pass
2320
pass
2320¼
9.03
2
pass
2321
pass
2321
9.57
1
2322
2323
2322
2323
2322¼
2323¼
DR
DT
10.66
3
pass
2325
pass
2325¼
11.22
5
2326
2327
2326
2327
2326
2327
11.49
pass
2328
pass
2327¾
12.43
2
2330
2330
2329½
2330
2329¼
2330¼
13.03
pass
2331
pass
2331¼
13.35
pass
2331½
pass
2331½
14.68
2
2334
2334
2333½
2334½
2333½
2334¾
17.40
2
2338
2338
2338
2338½
2338
2339
19.02
2
2341
2342
2341½
2342½
2341½
2342¼
DT
DW
21.40
2
2346
2346
2346
2346½
2346
2346
22.48
2
2349
2349
2348½
2349
2349
2350
+1
23.63
2
2352
2352
2351½
2352
2352
2352
25.48
1
2356
2356
2357
+1