2U75 2303 London Waterloo to Windsor & Eton Riverside
Departing on 16th November 2024

operated by
South Western Railway
8 coaches
450073
450040
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
23
2303
2303
2308
+5
WR1
0.40
pass
2304½
pass
2309
+4
WR1
DWF
1.29
3
2307
2307
2306½
2307½
2311¼
2312¼
+4
1.78
pass
2309
pass
2313½
+4
DWF
DW
2.50
3
pass
2310
pass
2314½
+4
DW
DWS
3.17
pass
2310½
pass
2314¾
+4
3.74
6
2312
2313
2312
2313
2316½
2317¼
+4
DWS
DWS
4.60
1
pass
2314½
pass
2319
+4
5.72
4
2316
2317
2316
2317
2320½
2321¼
+4
7.07
4
pass
2319
pass
2323¼
+4
DWS
DR
8.21
2
pass
2320
pass
2324½
+4
9.03
2
pass
2321
pass
2325¼
+4
9.57
1
2322
2323
2322
2323
2326¼
2327½
+4
DR
DT
10.66
3
pass
2325
pass
2329¼
+4
11.22
5
2326
2328
2326
2328
2330
2331¼
+3
11.49
pass
2329
pass
2332
+3
12.43
2
2331
2331
2330½
2331
2333½
2334¼
+3
13.03
pass
2332
pass
2335¼
+3
13.35
pass
2332½
pass
2335¾
+3
14.68
2
2335
2335
2334½
2335½
2337¾
2338¾
+3
17.40
2
2339
2339
2339
2339½
2342
2343
+3
19.02
2
2342
2343
2342½
2343½
2345¾
2346¾
+3
DT
DW
21.40
2
2347
2348
2347
2348
2350
2351
+3
22.48
2
2350
2351
2350
2351
2353
2354
+3
23.63
2
2354
2354
2353½
2354½
2356
2358
+3
25.48
1
2359
2359
0002
+3