5S93 1925 London Waterloo to Woking
Departing on 3rd October 2024

operated by
South Western Railway
4 coaches
450002
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
17
1925
1924¾
DW
0.40
pass
1926½
pass
1926½
DW
DWS
1.29
4
pass
1929
pass
1929
1.78
pass
1930½
pass
1930¾
DWS
DW
2.50
3
pass
1932
pass
1932¾
DW
DWS
3.17
pass
1933
pass
1933½
3.74
6
pass
1934
pass
1935
+1
DWS
DWS
4.60
1
pass
1935
pass
1936¼
+1
5.72
4
pass
1937
pass
1937½
7.07
4
pass
1938½
pass
1941¼
+2
DWS
DH
7.54
2
pass
1939½
pass
1944
+4
8.47
2
pass
1940½
pass
1945½
+5
9.34
pass
1941½
pass
1946½
+4
9.53
2
pass
1942
pass
1946¾
+4
10.01
pass
1942½
pass
1947
+4
10.52
2
pass
1943½
pass
1947¾
+4
11.34
2
pass
1945½
pass
1948¾
+3
12.10
2
pass
1947½
pass
1949½
+2
13.40
2
pass
1951
pass
1951¼
14.19
pass
1952
pass
1952
14.48
pass
1957
pass
1953
-3
DH
DT
16.01
2
pass
1959
pass
1955¼
-3
18.53
2
pass
2002
pass
1957¾
-3
20.15
2
pass
2003½
pass
2001
-2
22.15
2
pass
2007
pass
2006¼
24.28
4
pass
2010½
pass
2010½
DT
DC
26.68
1
pass
2014½
pass
2013½
28.22
1
pass
2016
pass
2015½
29.25
pass
2017
pass
2017
DC
DBC
30.24
pass
2019½
No report
30.29
2
pass
2019½
pass
2020¾
+1
DBC
DS
31.51
3
pass
2022½
pass
2022
34.24
Approaching
Woking [WOK]
5
2029
2030¼
+1