5Y85 0955 London Waterloo to Wimbledon Park Depot Sdgs
Departing on 26th September 2024

operated by
South Western Railway
8 coaches
London Waterloo - Wimbledon Park C.S.D.
450061
450049
8 coaches
Wimbledon Park C.S.D. - Wimbledon Park Depot Sdgs
450049
450061
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 75mph
17
0955
0956½
+1
DW
0.40
pass
0956½
pass
0958½
+2
DW
DWF
1.29
3
pass
0959
pass
1000
+1
1.78
pass
1000½
pass
1001
DWF
DW
2.50
3
pass
1002
pass
1002½
DW
DMF
3.17
pass
1003½
No report
3.74
9
pass
1005½
pass
1007
+1
DF
4.60
pass
1007
No report
5.09
pass
1008
No report
5.60
East Putney [ZPU]
½
Service stops for pathing (passing train)
1010
1013½
No report
6.58
pass
1016½
No report
7.50
pass
1018½
No report
8.24
1020
1020
No report
EP