2E56 0731½ Dalmuir to Airdrie
Departing on 6th January 2025

operated by
ScotRail
6 coaches
318260
318265

This service is partially cancelled

This service was cancelled between Balloch and Dalmuir due to a signalling problem (track circuit failure) (IC).

GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
Balloch [BHC]
Pathed as Electric multiple unit at 75mph
0708
0708
-
1.15
0710
0710
0710
0710½
-
2.24
0713
0713
0712½
0713
-
3.77
0716
0716
0715½
0716
-
4.27
0717
0717
0717
0717½
-
5.05
0719
0719
0719
0719½
-
7.68
0724
0724
0723½
0724
-
9.41
0727
0727
0726½
0727
-
10.68
2
0730
0731
0729½
0731½
0731
US
11.53
1
0733
0733
0733
0733½
0732¾
0733¾
12.48
1
0736
0736
0735½
0736
0735½
0736
13.38
1
0738
0738
0738
0738½
0737¾
0738¾
14.48
1
0741
0741
0740½
0741
0741¾
0742½
+1
15.74
1
0744
0744
0743½
0744
0745¼
0746
+2
16.18
pass
0745
pass
0746¾
+1
16.42
pass
0745½
pass
0747¼
+1
US
UA
16.69
1
0747
0747
0746½
0747
0748¼
0749¼
+2
17.45
1
0749
0749
0748½
0749½
0750¾
0751½
+2
17.71
pass
0750½
pass
0752¼
+1
18.24
pass
0751
pass
0752¾
+1
19.23
1
0753
0753
0753
0753½
0754¾
0755¾
+2
20.03
9
0755
0757
0755
0757
0757¼
0758¼
+1
20.48
2
0759
0759
0758½
0759½
0759½
0800½
+1
20.71
pass
0800½
pass
0801¼
21.18
2
0802
0802
0801½
0802
0802¼
0802¾
22.79
2
0805
0805
0805
0805½
0805¾
0806¼
23.60
2
0808
0808
0807½
0808½
0808
0808½
24.73
2
0811
0811
0810½
0811
0810½
0811¼
25.73
2
0813
0813
0813
0813½
0813
0814
28.38
2
0817
0817
0817
0817½
0817½
0818
29.06
pass
0819
pass
0819½
29.14
2
0820
0820
0819½
0820½
0819¾
0820½
30.13
2
0823
0823
0822½
0823
0822½
0823½
31.01
1
0827
0826½
0827¼